Furnishing all labor, materials, equipment, and
performing all work necessary and incidental to the construction of the project
known as Curb Ramp Upgrades Sierra Bonita - Queenanne Road, DPW Project No. 18-06,
according to drawings and specifications prepared by the City of El Paso de
Robles and according to the Contract Documents. The work shall include but is
not limited to remove and replace existing curb ramps, spandrel, sidewalk, and
paving all as shown on the plans and/or as specified herein.
Project
is to be completed within Sixty (60)
WORK days from the date specified in the Notice to Proceed. The Contractor shall pay to the City of El
Paso de Robles the sum of $300.00 (Three
Hundred Dollars) for each and every calendar day’s delay in finishing the
work in excess of the calendar day completion time.
|
|
3/4/2019 8:00 AM
|
|
www.ciplist.com
|
|
4/18/2019 2:00 PM
|
|
City of Paso Robles, Attn: City Clerk's office
|
|
4/18/2019
|
|
April 9, 2019
|
|
None
|
|
Ditas Esperanza, P.E. Capital Projects Engineer (805) 237-3861
|
|
www.ciplist.com
|
|
Free Account with sign up.
|
|
www.ciplist.com or you may view these documents at City Hall, 1000 Spring Street, 2nd Floor, Paso Robles, CA 93446
|
|
8:00 AM to 5:00 PM
|
|
(805) 237-3904
|
|
www.ciplist.com
|
|
|
|