Following the closure of the bid submittal period, bids will be publicly opened and read for performing work as follows: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as North Paso Robles Airport Waterlines, DPW Project No. 17-19B, according to drawings and specifications prepared by the City of El Paso de Robles and according to the Contract Documents. The work shall include but is not limited to, installation of a 12-inch diameter ductile waterline and appurtenant structures, all as shown on the plans and/or as specified herein. [Note that the pipeline alignment is within the City of Paso Robles Municipal Airport. Contractor must adhere to special requirements for this work that is quided by the Federal Aviation Administration (FAA). In addition, the alignment is adjacent to environmentally sensitive areas (i.e. vernal pools), and drainage ways. Contractor must provide mitigation measures for the work adjacent to these environmentally sensitive areas.]
A non-mandatory pre-bid conference has been scheduled for Friday, March 6, 2020 at 10:30AM. We will meet at the Paso Robles Municipal Airport Terminal Lobby located at 4912 Wing Way, Paso Robles, CA.