Following the closure of the bid submittal period, bids will be publicly opened and read for performing work as follows: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Main West Tank (21st Street), DPW Project No. 17-24A, according to drawings and specifications prepared by the City of El Paso de Robles and according to the Contract Documents. The work shall include but is not limited to, demolition and removal of an existing reservoir and appurtenant structures and equipment, installation of a new 4 million gallon pre-stressed concrete tank and appurtenant structures and equipment, installation of temporary access for construction, and pipelines in adjacent streets, all as shown on the plans and/or as specified herein.
|
|
12/10/2018 12:00 AM
|
|
2/7/2019 2:00 PM
|
|
January 15, 2019 at 10AM
|
|
Access to the tank site is limited, so please park at the bottom of the existing access road to the tank, located at Almond Springs Drive and 21st Street. Ditas Esperanza, P.E. Capital Projects Engineer (805) 237-3861
|
|
www.ciplist.com
|
|
www.ciplist.com
|
|
|
|